Has anybody done a chain in Solidworks?

Discussion in 'SolidWorks' started by JF, Jun 9, 2005.

  1. JF

    JF Guest

    Has anybody done a chain in Solidworks?

    For example: make one drive sprocket and idler sprocket and the
    driven sprocket. make the chain and create the mates between the links (yes
    it took a long time).

    I can create the sprockets from Toolbox , create the path of the chain ,
    then create a surface that the chain will be tangent to , then start
    creating tangent
    mates I can get only 4 mates done when the assembly becomes over defined.
    (I mate a tangent mate between the link roller and the surface path)


    Can anybody shed some light on this .... please
     
    JF, Jun 9, 2005
    #1
  2. JF

    matt Guest

    The tangent mate is sometimes a bit quirky, tough to solve. Why don't
    you just use a sketch for the path of the centerlines of the rollers and
    mate the center points to the sketch. Much simpler for SW to solve.
     
    matt, Jun 9, 2005
    #2
  3. JF

    solid steve Guest

    Hi JF

    I model chains as a part. Sketch the centre line, model a link then use
    a curve pattern to attach to centre line, you have to make the length
    of the centre line divisable by the pitch obviously. I have examples if
    you like.

    steve
     
    solid steve, Jun 9, 2005
    #3
  4. Keep in mind that a lot of the time a full complete chain is not necessary
    and unnecessarily taxes the system. If you can accept it, put a sketch
    around the sprockets and then sweep the chain profile. That way it looks
    like it's going real fast!! Seriously, though, it shows a representation of
    the envelope that the chain occupies in its travels around the sprockets.

    WT
     
    Wayne Tiffany, Jun 9, 2005
    #4
  5. JF

    Kvick Guest

    I would like to have one... once had some time to play with chains, but
    tried the assembly approach...

    arto (dot) kvick (at) gmail (dot) com works OK...
     
    Kvick, Jun 9, 2005
    #5
  6. JF

    pete Guest

    Great idea Wayne!

    I made each chain part, then a sub-assembly, then I made it flexible, then a
    main assembly.
    It took forever to re-build, and when I moved it, the parts flew all over
    the place!, lol

    Your idea seems a lot easier.
    :)
     
    pete, Jun 9, 2005
    #6
Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments (here). After that, you can post your question and our members will help you out.