estimating

Discussion in 'SolidWorks' started by thestew, May 9, 2008.

  1. thestew

    thestew Guest

    Has anyone had any luck using solidworks to create bids orb estimates
    on jobs. As in being ablre to inbed the data into the models and then
    extract cost out of the assemblies. I know it is probably a long shot
    but I figure I would ask.
     
    thestew, May 9, 2008
    #1
  2. thestew

    j Guest

    We've used it in kind of a reverse way in figuring out the total cost of
    the job when it's finished. We'll export the BOM to Excel and include
    the cost of each item into the spreadsheet when it gets ordered since
    the person ordering has no SW license. Makes it easier in the end to add
    everything up. This could be done right in SW if it was available to
    him. So it would be possible to do the same thing that you're looking at
    doing right in SW.
     